Where FASO is now

Evidence should clarify the position, not replace the purpose.

FASO has progressed from concept to a working Version 1 system and complete Test Rig. Internal campaign evidence is active. Independent validation and operational use have not been completed.

Current public evidence register

What exists, what it supports and what it does not authorise.

A later unpublished result must not silently turn a fixed checkpoint into a live number. Public claims remain tied to their exact evidence and date.

EvidenceStateAuthorityPublic position
Purpose, doctrine and system architectureEstablishedInternal authorityControlled public explanation
Version 1 integrated systemBuiltInternal build recordBounded build claim
Complete end-to-end Test RigBuiltInternal build and test recordBounded capability claim
Published internal-assurance checkpointCompleted20 July 2026Fixed internal checkpoint
Governed internal assuranceActiveGoverned run evidenceControlled summaries
Independent blind validationNot completedFuture external authorityNo validation claim
Controlled operational pilotNot startedFuture separate authorityNo operational claim

Checkpoint boundary: The completed checkpoint records the accepted internal assurance position published for 20 July 2026. Internal work continued after that checkpoint. The number is not presented as a live counter or independent validation.

Three kinds of proof

Existence, execution and validity establish different things.

FASO’s public language must state what the evidence actually supports.

01

Build evidence

Does the capability exist?

Integrated capability, controlled assurance, retained evidence and protected recovery records.

02

Run evidence

What did the system do?

Governed records, actual outcomes, time order, identity and retained evidence.

03

Validation evidence

Does the proposition survive independent challenge?

Independent control, externally established reference evidence, limitations and an independent final report.

Evidence discipline

A result must remain reviewable after the run has ended.

  1. Immutable evidence and run identity
  2. Authority and operator
  3. Beginning and ending time
  4. Exact input and output references
  5. Configuration and source-integrity records
  6. Expected and actual outcomes
  7. Pass, fail, blocked or not-run status
  8. Evidence links and digests
  9. Plain-English explanation
  10. Limitations and uncertainty

Next evidence gate

Internal proof prepares FASO to be challenged. It does not complete the challenge.

The Test Rig and validation page explains exactly where internal testing ends and independent validation begins.